Non-Residential Solar Photovoltaic (PV) Inspections

  1. A representative of your company that is familiar with the installation must be on site for the inspection.
  2. Provide city approved plans on site for all inspections.
  3. Provide access for all rough electrical wire, conduit, boxes, fittings, etc.
  4. Verify all tags, signs, stickers, overcurrent protections, and components as required by the adopted NEC code.

Residential Solar Photovoltaic (PV) Inspections

  1. A representative of your company that is familiar with the installation must be on site for the inspection.
  2. Provide city approved plans on site for all inspections.
  3. Verify all required tags, signs, stickers, overcurrent protections, and components as required by the adopted NEC code and approved plans.
  4. Provide approved photos of rough wiring, roof rack bonding, all junction boxes, flashing, bonding, grounding, etc. for inspections.

Click here to see examples of required photos.

Subscribe to
Email Notifications
Sign Up for
Text Message Alerts
Download the
Riverton Connect App